This picture shows the auditorium after a partial clean. The walls and the roof have been done. The seats and the floor have still to be done. Before that the fire doors need finishing, and there will be a partial electrical rewire, and the stage curtains which have been cleaned now need re-hanging. And I’ve a lot of cleaning backstage – which only I can do.
But up to today the auditorium was full of scaffolding. This is the first time I have been able to properly see the cleaned walls.
Wonderful to hear.
Light at the end of a very long dark tunnel.